Phase change line

A phase change line is a vertical line on a graph, often dashed, that marks where one condition ends and another begins. The most common example is the line between baseline and intervention. Data on either side are compared to see whether behavior changed.

What is a phase change line?

It is a vertical line drawn between two sessions to show that something about the program changed at that point, such as intervention starting, a new teaching procedure, or a return to baseline. It splits the graph into phases so you can compare level, trend, and variability from one phase to the next.

How do you draw a phase change line?

Draw a vertical line between the last data point of the old phase and the first data point of the new one, extending from the horizontal axis to the top of the graph. Data paths are not connected across the line. Label each phase, such as Baseline and Intervention, above the graph.

Example: Noah's plan moved from baseline to intervention at session 9. When you update the graph, you draw a dashed vertical line between sessions 8 and 9 and label the phases. You also do not draw the data path across the line.

What can you tell from the line?

The line alone says only that something changed. The meaning comes from comparing the data before and after it. If the points drop sharply just after the line for a behavior being reduced, that may suggest the plan is working. The supervisor interprets this, and you report what you see.

  • Baseline to intervention
  • One intervention to a modified version
  • A change in teaching method or reinforcement

What if a session is missed?

A missed session is not graphed as zero. Leave a gap in the data path, because zero would suggest the behavior did not occur when in fact no data were collected. Keep the session number or date in order so the timing of the phase change is still accurate and readers see that a day was skipped.

What exam traps involve phase change lines?

Questions ask what a dashed vertical line represents, and the answer is a change in conditions, not a missing data point or a goal line. Another trap is drawing the line through a data point rather than between points, or connecting the data path across it as if nothing changed.

  • Treating the line as a goal or mastery line
  • Connecting the data path across the line
  • Graphing a missed session as zero

Practice questions

Question 1 · Data collection and graphing

On a learner's graph there is a vertical dashed line between sessions 8 and 9. What does this line indicate?

Question 2 · Data collection and graphing

While updating Noah's graph, a technician sees that the plan moved from baseline to intervention today. How should the graph show this change?

Question 3 · Data collection and graphing

After session 12, a technician adds today's result of 70% correct to a line graph with sessions on the x-axis and percent correct on the y-axis. Where does the point go?

Question 4 · Data collection and graphing

Zoe was absent on Tuesday, so no session took place. When updating her graph of daily aggression counts, what should the technician do for Tuesday?

Questions people ask

Who decides when to add a phase change line?

The plan changes only when your supervisor says so. You draw the line when that change is made.

Do I need a line for every program change?

Follow your supervisor's graphing guidance on which changes get a line and which are noted another way.

How ready are you?

Ten questions, about 3 minutes, no account. Get your readiness score and your weakest domains.

Check my readiness